| Announcement summary: |
Vancouver, BC – Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQB: SYHBF) (Frankfurt: SC1P) (the “Company”) is pleased to announce the second set of geochemical assay results and completion of its 2021 summer/fall diamond drilling program which totaled 19 holes in 6,598m at its 100% owned Moore Uranium Project. The Moore Project comprises 35,705 hectares, about 15 kilometres east of Denison Mine’s Wheeler River project and near regional infrastructure for Cameco’s Key Lake/McArthur River operations in the Athabasca Basin, Saskatchewan. Drillhole ML21-13 confirmed the presence of additional high grade basement-hosted uranium mineralization at the Maverick East Zone. This hole returned 0.994% U3O8 over 5.7 metres, including 1.51% U3O8 over 2.5 metres. The geochemistry and geology from the Grid 19 targets illustrated the prospectivity of this area which warrants further drilling. Samples from the final six holes that tested the Maverick East Zone have been delivered to the lab and assay results are still pending. Hole ML21-13 was drilled within the east central portion of the Maverick East Zone. This hole intersected predominantly basement-hosted mineralization and returned 0.994% U3O8 over 5.7 metres from 270 metres to 275.7 metres including an interval of 1.51% U3O8 over 2.5 metres from 273.2 metres to 275.7 metres. The uranium mineralization was accompanied by intense clay alteration of the graphitic pelitic assemblages. |