Loncor Gold Inc.

Announcement Date: 2021-11-11
Announcement Type: Drilling Results
Announcement Code: NI43-101
Company name: Loncor Gold Inc.
Project name: Imbo
Location: Democratic Republic of the Congo
Commodities: Gold
Highlight: Drilling results incl. 22.03m @ 5.11g/t Au from 574.87m
Resources: only available to subscribers
CP/QP: only available to subscribers
Announcement summary: Toronto, Canada – November 11, 2021 – Loncor Gold Inc. (“Loncor” or the “Company”) (TSX: “LN”; OTCQX: “LONCF”; FSE: “LO51”) is pleased to announce assay results from its drilling program within its 84.68%-owned Imbo Project in the eastern part of the Ngayu greenstone belt in the Democratic Republic of the Congo. The final borehole of this year’s drilling program, borehole LADD026 drilled at its Adumbi deposit intersected 22.03 metres grading 5.11 grammes per tonne (g/t) gold (including 14.70 metres grading 7.19 g/t gold), 11.20 metres grading 4.93 g/t gold, 4.83 metres grading 2.51 g/t gold and 6.50 metres grading 2.36 g/t gold (see Figures 1, 2 and 3 below). Significant mineralized sections for borehole LADD026 are summarised in the table below Note: It is estimated that the true width of the mineralised sections for core hole LADD026 is 74% of the intersected widths in the above table. Regular measurements of inclination and azimuth were taken at 30 metre intervals down the hole and all the core was orientated. All intercepted grades are uncut with maximum internal dilution equal to or less than 4 metres of intersected width. The maximum grade intercept was 19.80 g/t Au over 0.63 metres.