Liontown Resources Ltd.

Announcement Date: 2021-11-11
Announcement Type: Feasibility Study
Announcement Code: JORC
Company name: Liontown Resources Ltd.
Project name: Kathleen Valley
Location: Australia
Commodities: Tantalum,Lithium
Highlight: DFS results incl. post-tax NPV (8%) of A$4.2B & IRR of 57%
Resources: only available to subscribers
CP/QP: only available to subscribers
Announcement summary: Definitive Feasibility Study (DFS) confirms the potential to develop a state-of-the-art, secondgeneration lithium-tantalum mining and processing operation at the 100%-owned Kathleen Valley Project in WA’s North-eastern Goldfields. Building on the October 2020 Pre-Feasibility Study (PFS), the DFS base production has been increased from 2Mtpa to 2.5Mtpa, producing ~500ktpa of spodumene concentrate with a 4Mtpa expansion planned in Year 6, to deliver ~700ktpa spodumene concentrate. The DFS optimises the mine schedule, process plant design and forecast sales pricing to enhance the outstanding technical and financial viability of a standalone, long-life 4Mtpa operation. In doing so it delivers a substantial increase in the Post Tax NPV(8%) to A$4.2B, a payback of 2.3 years and a Life of Mine (LOM) free cash flow (post tax) of A$12.2B. The Inferred material does not have a material effect on the technical and economic viability of the Project. Refer to pages 24 and 25 for additional information. There is a lower level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised.